A branded Accuwright heavy forklift moving a large blue machine section through a tight plant doorway

Heavy machinery moving

Machines this heavy don’t forgive guesswork.

Purpose-built machinery movers, on our own payroll, with our own iron: single-lift pick-and-carry to 118,000 lb, and engineered rigging systems for loads over 400,000 lb. Presses, CNC, injection molders, complete lines — off the truck, through the doorway, onto the anchors.

Tell us about the move Call 877-898-4377

Same-day pricing. Give us the details and you get a number back the same day, not in three to five business days.

Pictured: a machine section threading a doorway with inches to spare — the everyday version of this work.

How professional machinery movers run a move.

The reason nothing goes wrong on moving day is everything that happened before it.

  1. Survey and plan. Weight and center of gravity confirmed, route walked, floor loading and door dimensions measured, dock or no dock established. The plan exists before the equipment is chosen — never the other way around.
  2. Equipment matched. Pick-and-carry forklift, machinery skates, jacks or an engineered system — sized to the machine, staged on our own trucks, arriving with the crew that will run it.
  3. The move. Rigged, lifted, walked and landed by riggers who do this daily — one signal caller, a planned path, and no improvising with someone’s production asset in the air.
  4. Set, level, verify. On the anchors, shimmed and leveled to spec — and because our movers are also millwrights, alignment, reconnection and startup support are the same crew, not a second contractor.

Certificates of insurance and the full safety record are available on request — most GC and Avetta/ISN prequalification screens pass on sight.

The machines heavy machinery movers get called for.

Most of what we move is production equipment: injection molding machines, stamping and forming presses, press brakes, CNC machining centers and lathes, grinders, industrial ovens, compressors and chillers, transformers, robots and complete automation cells — among plenty that fits no category. As a certified installer for equipment including ENGEL, LS, Woojin, Arburg, Amada, JSW, Trumpf, Okamoto, MultiCam and Stamtec, among many others, our crews know where a machine may be lifted and what it must never hang from — before it leaves the floor.

Representative, not exhaustive — if it is heavy and it has to move, ask.

A heavy forklift engaging a complex machine assembly at close range inside a warehouse
Close work: the pick is planned around the machine’s frame, not around convenience.

A machinery mover is not a freight company with a forklift.

The cheapest quote on a machine move is usually from someone who has never moved one.

General freight & warehouse crews

  • Warehouse forklifts adapted to loads they were never built for
  • No route survey, no floor-loading check, no lift plan
  • The machine is a pallet with a higher number on it
  • Damage shows up at startup — long after the truck is gone

Purpose-built machinery movers

  • Pick-and-carry machines rated to 118,000 lb, built for exactly this
  • Engineered rigging systems past 400,000 lb when the job outgrows a single lift
  • Riggers who are also millwrights — set, level and align included
  • EMR 0.72, zero OSHA recordables 2022, 2023, 2024 and 2025

That difference is why OEMs and plants that have been burned once send the second machine to us. Moving day is the cheapest place to protect a machine worth more than the building it sits in.

The record behind the picks.

Anyone can say “fully insured.” These are the numbers procurement actually screens on.

  • 118,000 lbSingle-lift pick-and-carry
  • 400,000+ lbEngineered rigging systems
  • EMR 0.72NCCI interstate rating — zero actual incurred losses
  • Zero OSHA recordables2022, 2023, 2024 and 2025 — with NCCCO certified operators

Trusted by ENGEL, Masonite, Purina, Owens Corning, Duracell and Victaulic, among others.

Machinery movers wherever the machine is.

Home ground is the Southern Industrial Corridor — South Carolina to Texas, run from two shops: Greenville, Georgia for the eastern corridor along I-85 and I-20, and Fort Worth, Texas for DFW and the western corridor. Beyond it, crews, machines and lowboys mobilize from those shops coast to coast and from Mexico to Canada — the same logistics we sell. When we quote the North, the Northeast and the West Coast, we win work. Test us against your locals.

A machine that moves between states needs a mover documented to work in both. Our NCCI interstate experience rating exists because the work is interstate — third-party paperwork, not a claim on a website.

Tell us about the move.

Weight, dimensions and access are what set the price — the more you can give us here, the closer the first number will be. Same-day pricing: a number back the same day, not in three to five business days.

"*" indicates required fields

Contact Information

Date of Move

MM slash DD slash YYYY

Move - From Address

Move - From Address

Move - To Address

Move - To Address

Machine Information

In-house move?

Accessibility for Machine #1 Name

Location of machine
Is floor suitable for heavy move?
Ground-level access to building?

Crating / Packaging

Does machinery require a crating or packaging?
Does machinery require a shipping container for exporting?

Rather talk it through? 877-898-4377 — you will get someone who has moved machines for a living. Related: rigging · plant relocation · heavy equipment storage · operated forklift rental · what is heavy machinery moving?

Heavy machinery moving, explained.

How heavy a machine can you move?

Single-lift pick-and-carry to 118,000 lb with purpose-built machinery movers. Above that, engineered rigging systems handle loads over 400,000 lb — different equipment, engineered per lift. Between the two there is very little on a plant floor we have not moved.

How much does it cost to move heavy machinery?

Four things set the number: the machine’s weight and dimensions, access at both ends (dock, door sizes, floor condition), the distance between them, and whether the scope includes disconnect, reconnect and leveling. Send those through the form and pricing is same-day. Want a ballpark before talking to anyone? The free Rigging Cost Estimator gives a rough range in minutes, no contact details asked.

What’s the difference between machinery moving and rigging?

Rigging is the lifting discipline — slings, spreader bars, engineered lift plans. Machinery moving is the whole errand: rig it, transport it, land it, set it, level it. We do both with one crew, which is why the handoff problems other projects have don’t exist here. The deeper dive: what is heavy machinery moving?

Do you move machines inside the plant, not just between plants?

Constantly. In-plant relocations, line reconfigurations, moving a machine to make room for the next one — same equipment, same crew, usually inside a window your production schedule dictates. Never missed a startup in 25 years.

Can you move a machine out of a building with no dock?

Yes — that is normal, not exceptional. Pick-and-carry machines bring the load to grade, and when the door is the problem, enlarging an opening and restoring it afterward is part of the plan. The route survey happens before the quote, so none of this is a surprise on moving day.

Can you store the machine between locations?

Yes — dry indoor storage and secure outdoor laydown, received on our own equipment, crated for export where needed under our ISPM-15 certification, redelivered when your floor is ready. See heavy equipment storage.

Are you insured for this? Can my GC prequalify you?

EMR 0.72 on the NCCI interstate rating with zero actual incurred losses, zero OSHA recordables in 2022, 2023, 2024 and 2025, NCCCO certified operators, drug-free workplace, Avetta and ISNetworld registered. Certificates of insurance and full documentation are available on request — prequalification screens are usually the easiest part of our job.

Who does the work?

Millwrights and riggers on Accuwright’s own payroll, with our own machines and our own trucks — our crews self-perform the core work. One contract, one point of accountability, and the same crew can level, align and reconnect the machine after the move.

Call Now Send Details